prioritising lean construction barriers in uganda's construction industry
Clicks: 266
ID: 195940
2009
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Star Article
30.0
/100
266 views
46 readers
AI Quality Assessment
Not analyzed
Readership in this journal
StarRanked #6 of 8 articles by views in transportation science
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength) on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong), yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.
| Reference Key |
alinaitwe2009journalprioritising
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Henry Mwanaki Alinaitwe |
| Journal | transportation science |
| Year | 2009 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.