an interactive construction project for method of statement based on bim technologies for high-speed modular building
Clicks: 194
ID: 177550
2016
Article Quality & Performance Metrics
Overall Quality
Improving Quality
0.0
/100
Combines engagement data with AI-assessed academic quality
Reader Engagement
Emerging Content
6.0
/100
20 views
20 readers
Trending
AI Quality Assessment
Not analyzed
Abstract
The concept and methodology for interactive design of Methods of Statement based on the use of technical and informational models, technological charts, and 3D models of construction facilities is suggested. The article presents the peculiarities and principles for the speed-up assembling (erection, disassembling) of unified modular structures, pre-fabricated block sections, their transportation and rapidly erected modular buildings. The high speed of construction is reached due to the qualitative interactive Method of Statement, logistics of sequence and completeness of information, use of BIM technologies, unconditional use of permanent quality control of works execution at all construction stages with the automatic control of accuracy as to positioning of construction structures and execution of construction and technological operations.
| Reference Key |
sychev2016architecturean
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Sergei Sychev;Gennady Badin |
| Journal | architecture and engineering |
| Year | 2016 |
| DOI |
10.23968/2500-0055-2016-1-4-36-41
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.