enhancing capacities of riparian professionals to address and resolve transboundary issues in international river basins: experiences from the lower mekong river basin
Clicks: 181
ID: 175989
2012
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
181 views
19 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #108 of 303 articles by views in materials research bulletin
Most read
Least read
Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 303 in total.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
This paper analyses the design and impact of capacity building programmes aimed at enhancing capacities of riparian professionals to address and resolve transboundary issues in international river basins. The case study is a programme developed by the Mekong River Commission (MRC). A post-training evaluation was applied to assess its impact in terms of individual capacity enhancement and change (use and application of knowledge, factors hampering application, and change in function and opportunities within the organisation). The design of the Capacity Building Programme of the MRC Flood Management and Mitigation Programme required a well balanced range of subjects (such as IWRM (integrated water resources management), model and decision support systems, and international water law). The post-training evaluation, 6 months after the last training workshop, showed an increase in familiarity with the topics for all 37 respondents, with the highest increase for the respondents with few years of working experience and from training and education institutions. The relevance of the subjects taught was highlighted by 95% of the respondents, and 78% of the participants had already used some of the acquired knowledge in their job. The respondents indicated that they did not have sufficient opportunities to apply all knowledge. The phased implementation and training of lecturers during the training workshops had a good impact, directly through increasing involvement in facilitation and delivery of the capacity building programme and through the use of the knowledge gained in short courses and development of curricula at their institute. For these types of capacity building programmes, a few recommendations can be made. The selection of participants is crucial for the application of the learned knowledge in their work. The integrative nature of transboundary water issues calls for a capacity building programme addressing a wide range of subjects, which can be understood by a wide range of professionals from different sectors. Training methods should also address this integrative nature through, e.g. roleplays and case studies. A successful capacity building programme needs to address the three levels of capacity building (enabling environment, organisations, and individual staff) and involve national and regional training and education institutes.
| Reference Key |
douven2012hydrologyenhancing
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;W. Douven;M. L. Mul;B. Fernández-Álvarez;S. Lam Hung;N. Bakker;G. Radosevich;P. van der Zaag |
| Journal | materials research bulletin |
| Year | 2012 |
| DOI |
10.5194/hess-16-3183-2012
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.