simulation study of longitudinal forces in the coupling device of heavy freight trains

Clicks: 104
ID: 174013
2014
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #65 of 71 articles by views in electrochemistry communications

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
On the LHS line (Broad-gauge Metallurgical Line), far out West of the railway line with a gauge of 1520 mm, heavy goods trains for a gross weight 5500 tons and a length of 850 m are operated. The article presents the results of a simulation study of the forces that occur in the automatic coupling device of SA-3 type of Russian production train consisting of 60 coal wagons of Russian construction of gross mass 91 tons each. The train moves on the 1520 mm gauge tracks curve S type (the radius of curvature of curves 300 m). Simulation studies were conducted using the Train Module of program to dynamic study multi-elements systems of Universal Mechanism UM 6.0.
Reference Key
stokosa2014advancessimulation Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Józef Stokłosa;Marek Jaśkiewicz
Journal electrochemistry communications
Year 2014
DOI
10.12913/22998624.1091874
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.