challenges and thoughts on risk management and control for the group construction of a super-long tunnel by tbm

Clicks: 40
ID: 162346
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #40 of 41 articles by views in Future medicinal chemistry

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The total length of the second stage of the water supply project in the northern areas of the Xinjiang Uygur Autonomous Region is 540 km, of which the total length of the tunnels is 516 km. The total tunneling mileage is 569 km, which includes 49 slow-inclined shafts and vertical shafts. Among the tunnels constructed in the project, the Ka–Shuang tunnel, which is a single tunnel with a length of 283 km, is currently the longest water-conveyance tunnel in the world. The main tunnel of the Ka–Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections, and 34 drilling-and-blasting sections, with 91 tunnel faces. The construction of the Ka–Shuang tunnel has been regarded as an unprecedented challenge for project construction management, risk control, and safe and efficient construction; it has also presented higher requirements for the design, manufacture, operation, and maintenance of the TBMs and their supporting equipment. Based on the engineering characteristics and adverse geological conditions, it is necessary to analyze the major problems confronted by the construction and systematically locate disaster sources. In addition, the risk level should be reasonably ranked, responsibility should be clearly identified, and a hierarchical-control mechanism should be established. Several techniques are put forward in this paper to achieve the objectives mentioned above; these include advanced geological prospecting techniques, intelligent tunneling techniques combined with the sensing and fusion of information about rock parameters and mechanical parameters, monitoring and early-warning techniques, and modern information technologies. The application of these techniques offers scientific guidance for risk control and puts forward technical ideas about improving the efficiency of safe tunneling. These techniques and ideas have great significance for the development of modern tunneling technologies and research into major construction equipment. Keywords: Super-long tunnels, Group construction by TBM, Risk management and control, Technical measures
Reference Key
deng2018engineeringchallenges Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Mingjiang Deng
Journal Future medicinal chemistry
Year 2018
DOI
DOI not found
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.