application and seepage analysis of cutoff wall with slurry trench method in buyukkumla dam
Clicks: 171
ID: 161876
2019
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
30.0
/100
171 views
22 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #2 of 2 articles by views in nurturing nature and the environment with young children: children, elders, earth
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Buyukkumla Dam, which is a concrete faced rockfill dam is located on Buyukkumla stream, 10,00 km northwest of Gemlik district of Bursa. It is intended to provide drinking and industrial water of 19 million m 3 per year to Gemlik, Kucukkumla, Buyukkumla, Narli, Gencali, Kursunlu and Umurbey region. The dam has -10,00 m foundation level and 68,00 m crest level, where the parapet elevation is 70,00 m. The crest width and length of Buyukkumla Dam are 10,00 m and 385,00 m, respectively. The diversion is provided by a tunnel with a diameter of 3,00 m. Spillway is designed with a threshold width of 25,00 m, hand-held and uncontrolled. The excavation of the foundation of the dam was carried out below sea level. In order to make the dam body excavations in a dry environment, it was mandatory to eliminate seawater and groundwater effects. Therefore, by applying slurry trench, seawater effect was removed from the dam reservoir and the leaks under the dam were taken under control. This method was applied first time at the Aslantas Dam in Turkey and became successful to eliminate the effect of ground water level. In the slurry trench method, the purpose is to prevent leakage or to prolong the infiltration. In Buyukkumla Dam, slurry trench along the axillary axes was applied under upstream and downstream cofferdams. In this article, cutoff walls were modeled by using Seep/w program and the results of the field measurements were compared with the analysis results.
| Reference Key |
unsever2019sleymanapplication
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Yesim S. UNSEVER;Eda Nur CAKIR |
| Journal | nurturing nature and the environment with young children: children, elders, earth |
| Year | 2019 |
| DOI |
10.19113/sdufenbed.571099
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.