carbon farming in hot, dry coastal areas: an option for climate change mitigation
Article Quality & Performance Metrics
Readership in this journal
PopularRanked #20 of 35 articles by views in itinéraires
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
Abstract
In a system in which desalinated seawater is used for irrigation and for delivery of mineral nutrients, the sequestration costs were estimated to range from 42–63 EUR per tonne CO2. This result makes carbon farming a technology that is competitive with carbon capture and storage (CCS). In addition, high-resolution simulations using an advanced land-surface–atmosphere model indicate that a 10 000 km2 plantation could produce a reduction in mean surface temperature and an onset or increase in rain and dew fall at a regional level. In such areas, plant growth and CO2 storage could continue until permanent woodland or forest had been established. In other areas, salinization of the soil may limit plant growth to 2–3 decades whereupon irrigation could be ceased and the captured carbon stored as woody biomass.
| Reference Key |
becker2013earthcarbon
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;K. Becker;V. Wulfmeyer;T. Berger;J. Gebel;W. Münch |
| Journal | itinéraires |
| Year | 2013 |
| DOI |
10.5194/esd-4-237-2013
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
ZincirX productsfrom the team behind Journament
-
PatentYazar
Patent drafts for the EPO, USPTO and TürkPatent
From inventor notes to a DOCX draft: description, claims, abstract. The machine drafts, the attorney signs.
See how it works (opens in a new tab) -
Projenator
Have a project idea? Score and plan it with AI
AI scores your idea in five dimensions and builds a phased plan. Your first project is free, no card needed.
Start your first project (opens in a new tab)
Cookies
We use strictly necessary cookies to run the site and keep you signed in. With your permission we would also use Google Analytics to see how the site is used, and Google AdSense to show ads on journal and article pages. Both stay off unless you accept, and you can change your mind at any time. How we use cookies · KVKK notice (Türkiye)
Cookie settings
Comments
No comments yet. Be the first to comment on this article.