development of a preventive maintenance strategy for an automatic production line based on group maintenance method
Clicks: 3
ID: 150063
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
0.6
/100
3 views
1 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #27 of 27 articles by views in cancer immunology, immunotherapy : cii
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The high maintenance costs and low reliability of automatic production line are attributed to the complexity of maintenance management. In the present study, a preventive maintenance strategy for the automatic production line was developed based on the group maintenance method. The criticality of machines in the production line was evaluated, and then the machines were classified into three groups: the most critical machines, the secondary critical machines and the general machines. The general machines were performed on the breakdown maintenance. The preventive maintenance model of the most critical machines was established with the shortest shutdown time as decision objective on basis of the Delay-time theory. The maintenance model of the secondary critical machine was established based on the considering of reliability-maintenance cost. A case study on an automotive part automatic production line was carried out to verify the proposed preventive maintenance strategy based on the production line data, and the maintenance periods of the most and secondary critical machines were gained; meanwhile, the machines all satisfied the reliability requirements during the maintenance periods.
| Reference Key |
li2018applieddevelopment
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Guofa Li;Yi Li;Xinge Zhang;Chao Hou;Jialong He;Binbin Xu;Jinghao Chen |
| Journal | cancer immunology, immunotherapy : cii |
| Year | 2018 |
| DOI |
10.3390/app8101781
|
| URL | |
| Keywords | Keywords not found |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.