technical and organisational aspects of production preparation on the example of door factory

Clicks: 18
ID: 149098
2013
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #69 of 71 articles by views in electrochemistry communications

Most read Least read

Bar heights use a square-root scale.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
The aim of the work is the analysis of the organization of production, and door-producing undertaking to propose technical solutions that could improve production efficiency and reduce costs. On the basis of an analysis of the existing organizational and technical production plant a proposal of changes was presented. These changes depend on replacing a group of machines with one CNC EGURKO automatic line.
Reference Key
rudawska2013advancestechnical Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Anna Rudawska;Agnieszka Seń;Leszek Semotiuk
Journal electrochemistry communications
Year 2013
DOI
10.5604/20804075.1073055
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.