aplikasi manajemen risiko pada pembangunan sistem penyediaan air minum (spam) regional jawa tengah (studi kasus pada pembangunan jaringan transmisi spam regional bregas)
Clicks: 411
ID: 144143
2016
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Star Article
30.0
/100
411 views
54 readers
AI Quality Assessment
Not analyzed
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
The increasing need for drinking water and undistributed raw water source needs solution with SPAM, Central Java Region. One of it is SPAM Bregas Region which the service locations are in Brebes Districts, Tegal City, and Tegal District. In the process of the transmission network development, there come some risks that hamper so that it needs for further research. This research aims to identify risks, analyze the amount of risk probability and give policy recommendations. The responden of study are government agencies as providers the transmission pipelines development projects of Bregas Regional SPAM, also the supervision consultants and contractors as a service providers. The method used is to spread the questionnaire to each stakeholder for structuring the risk of using RBS (Risk Breakdown Structure) and multiplying the value of the impact and frequency to obtain the value of the level of risk for each risk factor. The results showed the risks that happened in transmission network development in Bregas Regional SPAM are different from each stakeholder. Risks from perception of the supervising consultant 21.95% is accepted, 18.29% mitigated, and 59.76% avoided. Risk from owner perseption 32.93% is accepted, 23.17% mitigated, and 43.90% avoided. Rizks from contractor perseption 23.17% is accepted, 29.27 mitigated, and 47.56% avoided. Overall stakeholder’s biggest risk is land acquisition.
| Reference Key |
septiani2016mediaaplikasi
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Hernoni Septiani;M. Agung Wibowo;Syafrudin Syafrudin |
| Journal | media komunikasi teknik sipil |
| Year | 2016 |
| DOI |
10.14710/mkts.v21i2.11238
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org