A study on Hydroelectric and Irrigation potential of Dikhow river, Assam

Clicks: 215
ID: 13821
2017
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Steady

Ranked #88 of 148 articles by views in adbu journal of engineering technology

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 148 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
Hydropower as a form of renewable resource is very essential in the sustainable development of a country. On the basis of various studies made on Dikhow a perennial river of length of 255.8 km using GIS and Remote sensing an attempt has been made to locate suitable sites for dams for generating power or supplying water for irrigation and other purposes. The river Dikhow originates at Assam-Nagaland border at 26.08°N latitudes and 94.56°E longitudes and flows though the plains of Assam and finally to the mighty Brahmaputra at 26.99°N latitudes and 94.45°E longitudes covering an area of 4128.42 km2. An attempt has been made to create a thematic assessment map to locate suitable sites for dam using remote sensing and geographic information system (GIS). The characteristics of these thematic maps have been derived with the help of different softwares (Arc GIS 10.1, and Global Mapper 11). A database of the catchment area is constructed to decide the locations of the proposed dams. From the three locations(site 1,2 and 3) chosen, site 1 has been considered suitable for irrigation purposes whereas out of the sites 2 and 3 are chosen for Hydropower generation, site 2 has been considered more suitable for the purpose, because of its more reservoir storage, lesser width of the channel and presence of suitable foundation material required for dam construction.
Reference Key
barik2017aadbu Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors Punit Al Barik;Mriganka Mazumdar;Mrinal Kr. Dutta;
Journal adbu journal of engineering technology
Year 2017
DOI
DOI not found
URL
Keywords Keywords not found

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.