estimation of sea current energy potential by using calculation models of horizontal axis current turbine in toyapakeh strait, nusa penida, bali
Clicks: 91
ID: 136563
2018
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This
article has not been analysed, so there is no overall score —
reader engagement is measured and shown alongside.
Reader Engagement
Steady Performance
27.0
/100
91 views
21 readers
AI Quality Assessment
Not analyzed
Readership in this journal
SteadyRanked #13 of 15 articles by views in clinical linguistics & phonetics
Most read
Least read
Bar heights use a square-root scale.
Mint this article as an NFT
Not yet mintedCreate a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.
5
SUSD
one-off · no wallet required
Abstract
Toyapakeh Strait has a fairly strong ocean current velocity with a velocity between 0.5 m/s – 3.2 m/s. The duration of the strong current (V> 0.5 m/s) ranges from 13-22 hours per day. The location of the strong current occurrence is located to the east of Nusa Lembongan Island, precisely at the stationary current measurement location. Vertical distribution of the direction and velocity currents at this location are not uniform from the top to the bottom, especially in the water column depths of 2 m, 4 m and 6 m, whereas at the water column depths of 8 m to 16 m are relatively uniform. Calculation results of potential electrical power by using the horizontal axis turbine model with a capacity of 35.9 kW (Rite Verdan), 100 kW (Tocardo DD702HT) and 250 kW (Tocardo DD1001HT) show that all of the values have the optimal electric powers, especially during the spring tide, whereas during the neap tide only the turbine with a capacity of 35.9 kW can retrieved an optimal electrical power. Calculation result of the electric power potential by using the method of calculation performed by the Electric Power Research Institute Inc. at the point of measurement, indicated that the total amount of energy 42.5 MWh per month for the turbine model Tocardo DD1001HT, 17.27 MWh per month for turbine model DD702HT Tocardo, and 9.08 MWh per month for the turbine model Rite Verdan. Keywords: Toyapakeh Strait, current velocity, time duration, electric power, depth of the water column
| Reference Key |
rachmat2018bulletinestimation
Use this key to autocite in the manuscript while using
SciMatic Manuscript Manager or Thesis Manager
|
|---|---|
| Authors | ;Beben Rachmat;Delyuzar Ilahude |
| Journal | clinical linguistics & phonetics |
| Year | 2018 |
| DOI |
DOI not found
|
| URL | |
| Keywords |
Citations
No citations found. To add a citation, contact the admin at info@scimatic.org
Comments
No comments yet. Be the first to comment on this article.