study on analog theory of rock mass simulation and its engineering application

Clicks: 255
ID: 130865
2013
Article Quality & Performance Metrics
Overall Quality
Not rated
Combines reader engagement with the AI quality analysis. This article has not been analysed, so there is no overall score — reader engagement is measured and shown alongside.
AI Quality Assessment
Not analyzed
Readership in this journal
Popular

Ranked #34 of 1,093 articles by views in journal of power sources

Most read Least read

Bar heights use a square-root scale. Only the 120 most-read articles are drawn; the journal has 1,093 in total.

Mint this article as an NFT
Not yet minted

Create a permanent, verifiable on-chain record of this article on the Scimatic Network. The NFT is held in your Journament account, and you can withdraw it to your own wallet at any time.

5 SUSD one-off · no wallet required
Abstract
During construction of 3D geological models, it is difficult to determine the uniform between geological model and true model. As a comprehensive index, rock quality designation (RQD) is reliable to assess the rationality of geological models. Unfortunately, The RQD of rockmass is determined completely by the deterministic threshold value and directions of the scan lines presently. To avoid this drawback, the modified method of the RQD value based on the threshold value and 3D space is proposed in this paper. Simultaneously, the analogue-simulation method based on rupture mechanism and classification of discontinuities is proposed. The elliptical discontinuity is considered for general discontinuity, and the special discontinuities, such as bedding, fault, and interlayer are dealt with individually. The accuracy of the 3D model is verified by the modified RQD. The 3D model of the rockmass is analogue simulated through repetitively obtaining data from the interval confidence of geometrical parameters of discontinuities, which are determined by a mass of data derived from field investigation. Besides, the dam base of the Xiangjiaba hydropower station is taken as an example, and the 3D model of the dam base is analog-simulated; its stability is evaluated by DDA method. The safety coefficient of the dam base is obtained by utilizing the overload method.
Reference Key
shaorui2013mathematicalstudy Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Sun Shaorui;Lu Yexu;Xu Yuanyuan;Liu Jin;Wei Jihong
Journal journal of power sources
Year 2013
DOI
10.1155/2013/491069
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.