optimization design and application of underground reinforced concrete bifurcation pipe

Clicks: 119
ID: 216811
2015
Article Quality & Performance Metrics
Overall Quality Improving Quality
0.0 /100
Combines engagement data with AI-assessed academic quality
AI Quality Assessment
Not analyzed
Abstract
Underground reinforced concrete bifurcation pipe is an important part of conveyance structure. During construction, the workload of excavation and concrete pouring can be significantly decreased according to optimized pipe structure, and the engineering quality can be improved. This paper presents an optimization mathematical model of underground reinforced concrete bifurcation pipe structure according to real working status of several common pipe structures from real cases. Then, an optimization design system was developed based on Particle Swarm Optimization algorithm. Furthermore, take the bifurcation pipe of one hydropower station as an example: optimization analysis was conducted, and accuracy and stability of the optimization design system were verified successfully.
Reference Key
su2015mathematicaloptimization Use this key to autocite in the manuscript while using SciMatic Manuscript Manager or Thesis Manager
Authors ;Chao Su;Zhenxue Zhu;Yangyang Zhang;Niantang Jiang
Journal journal of power sources
Year 2015
DOI 10.1155/2015/948584
URL
Keywords

Citations

No citations found. To add a citation, contact the admin at info@scimatic.org

No comments yet. Be the first to comment on this article.